|
Vol.
|
No.
|
Year
|
Article Title
|
|
40
|
e-Edition 1
|
2004
|
Subjectivity
in Hazard Analysis by Felix Redmill
|
|
40
|
e-Edition 1
|
2004
|
A Review of Risk Analysis Tools Successful in Project Management
by Paul S. Ray, Surya Prasanna Kumar Chodimella, Balaji Pattabiraman and Ramji Srinivasan
|
|
40
|
2
|
2004
|
Establishing and Auditing Measures for Hazardous Energy Isolation
by Scott Gunderson
|
|
40
|
3
|
2004
|
Theory and Methods for Calculating Probability of Hazardous Events
by Vito Faraci
|
|
40
|
3
|
2004
|
Truck Engines, Space Shuttle Thrusters and Common Cause Failure Probability Determination
by Sergio Oliva, ASP
|
|
40
|
3
|
2004
|
Safety Strategies in Living Organisms
by Stuart Burgess
|
|
40
|
e-Edition 4
|
2004
|
Failure Modes of the F-1 Rocket Engine System
by Paul S. Ray, Ph.D., PE, CSP, C. Eng. (U.K.)
|
|
40
|
e-Edition 4
|
2004
|
Return to Sender: System Maintenance, Reverse Logistics, and Hazardous Materials Transportation
by Scott Gunderson
|
|
40
|
5
|
2004
|
Truck Engines, Space Shuttle Thrusters and Common Cause Failure Probability Determination — Revisited
by Sergio Oliva, ASP
|
|
40
|
5
|
2004
|
Fire Risk Analysis on Retailing Areas of a New Airport Terminal
by W.K. Chow and Candy M.Y. Ng
|
|
40
|
6
|
2004
|
A Model for Selecting Risk Assessment Tools for a Project
by Paul S. Ray, Ph.D., PE, CSP, C. Eng. (U.K.); Ramji Srinivasan; Thomas W. Merritt, Ph.D., PE; and Phillip A. Bishop, Ed.D
|
|
40
|
6
|
2004
|
Design Safety Compromises
by George A. Peters and Barbara J. Peters
|